Architectural rendering of Tonglu Yintai City
Customer-supplied references

Buildings. Applications. Project Conversations.

Explore reference locations supplied by Haichuang across different building types.

Project references

Buildings in focus

Browse customer-supplied project photography by building type.

Explore industry applications

Zhengzhou Central Hospital
Healthcare / Zhengzhou

مستشفى تشنغتشو المركزي

Outpatient rooms, wards and corridors have different hours of use and ventilation needs. Planning by zone helps match equipment to each space.

Airflow by zone
Match airflow and equipment capacity to room use and occupancy.
Quieter patient areas
Review equipment and duct noise when selecting units for wards.
Maintenance access
Plan space to reach filters and service panels.
Qingzhou Vienna International Hotel
Hospitality / Qingzhou

فندق تشينغتشو فيينا الدولي

Guest rooms, lobbies and service areas have different hours of use and comfort needs. Planning each zone separately helps match equipment to the way the hotel operates.

Guest room comfort
Select quiet units and allow guests to adjust the temperature in their rooms.
Public areas
Size equipment for changes in occupancy in lobbies, restaurants and meeting spaces.
Maintenance access
Leave room to reach filters and service panels with minimal disruption to guests.
Xinyang Vocational and Technical College
Education / Xinyang

كلية شينيانغ المهنية والتقنية

Classrooms, lecture halls and shared areas follow different schedules. Grouping rooms by use helps avoid conditioning empty spaces.

Room schedules
Group spaces by teaching hours and typical occupancy.
Classroom comfort
Review airflow and equipment noise where students need to hear clearly.
Term-break servicing
Allow access to filters and panels so routine maintenance can fit the school calendar.
Sanzao East Station
Transport / Project photo

محطة سانزاو الشرقية

Passenger halls, entrances and staff areas serve different needs. Plan for busy periods and the extra outdoor air that enters through doors.

Passenger peaks
Use the expected passenger peaks when assessing airflow and capacity.
Entrance zones
Review how door openings affect drafts and temperature near entrances.
Service access
Allow maintenance access away from busy passenger routes where possible.
Tonglu Yintai City
Retail / Architectural rendering

مدينة تونغلو ينتاي

Shops, public circulation and service areas have different operating hours and heat loads. Separate zones give each space more control.

Tenant flexibility
Plan zones around units that may operate on different schedules.
Peak trading hours
Account for customers, lighting and shop equipment when estimating loads.
Maintenance access
Coordinate ceiling clearances and access panels with the fit-out.
Beijing Daxing Residential Project
Residential / Architectural rendering

مشروع بكين داشينغ السكني

Living rooms, bedrooms and common areas have different comfort needs. Plan equipment locations around room use and the building layout.

Room-by-room comfort
Check solar exposure and room use before sizing equipment.
Quieter bedrooms
Review unit location and noise levels near sleeping areas.
Practical installation
Coordinate ceiling depth, drain routing and access for servicing.

No matches. Try another search or filter.

Commercial HVAC

Product Application Planning

Plan equipment around the building’s layout, hours of use and maintenance access.

رعاية صحية

Hospitals and clinics

List the rooms to serve, their operating requirements and where equipment can be accessed for maintenance.

Read the hospital reference
الضيافة

Hotels and guest rooms

Plan guest rooms, lobbies and service areas separately. Confirm ceiling clearance and maintenance access in each area.

Explore hospitality applications
تعليم

Schools and campuses

Group classrooms, lecture halls and shared spaces by their schedules. Note peak occupancy, ceiling clearance and service access.

View the campus reference
Commercial retail

Shopping centres and retail stores

Separate public areas, shops and back-of-house spaces in the equipment plan. Confirm opening hours, occupancy and maintenance access.

View the retail reference
Haichuang HVAC

Planning a building project?

Share the building use and equipment requirements with our team.

Discuss your project