Buildings in focus
Browse customer-supplied project photography by building type.
Hospital Central de Zhengzhou
Outpatient rooms, wards and corridors have different hours of use and ventilation needs. Planning by zone helps match equipment to each space.
- Airflow by zone
- Match airflow and equipment capacity to room use and occupancy.
- Quieter patient areas
- Review equipment and duct noise when selecting units for wards.
- Maintenance access
- Plan space to reach filters and service panels.
Hotel Internacional Qingzhou Viena
Guest rooms, lobbies and service areas have different hours of use and comfort needs. Planning each zone separately helps match equipment to the way the hotel operates.
- Guest room comfort
- Select quiet units and allow guests to adjust the temperature in their rooms.
- Public areas
- Size equipment for changes in occupancy in lobbies, restaurants and meeting spaces.
- Maintenance access
- Leave room to reach filters and service panels with minimal disruption to guests.
Colegio Técnico y Vocacional de Xinyang
Classrooms, lecture halls and shared areas follow different schedules. Grouping rooms by use helps avoid conditioning empty spaces.
- Room schedules
- Group spaces by teaching hours and typical occupancy.
- Classroom comfort
- Review airflow and equipment noise where students need to hear clearly.
- Term-break servicing
- Allow access to filters and panels so routine maintenance can fit the school calendar.
Estación Sanzao Este
Passenger halls, entrances and staff areas serve different needs. Plan for busy periods and the extra outdoor air that enters through doors.
- Passenger peaks
- Use the expected passenger peaks when assessing airflow and capacity.
- Entrance zones
- Review how door openings affect drafts and temperature near entrances.
- Service access
- Allow maintenance access away from busy passenger routes where possible.
Ciudad de Tonglu Yintai
Shops, public circulation and service areas have different operating hours and heat loads. Separate zones give each space more control.
- Tenant flexibility
- Plan zones around units that may operate on different schedules.
- Peak trading hours
- Account for customers, lighting and shop equipment when estimating loads.
- Maintenance access
- Coordinate ceiling clearances and access panels with the fit-out.
Proyecto residencial Daxing de Beijing
Living rooms, bedrooms and common areas have different comfort needs. Plan equipment locations around room use and the building layout.
- Room-by-room comfort
- Check solar exposure and room use before sizing equipment.
- Quieter bedrooms
- Review unit location and noise levels near sleeping areas.
- Practical installation
- Coordinate ceiling depth, drain routing and access for servicing.
No matches. Try another search or filter.
Product Application Planning
Plan equipment around the building’s layout, hours of use and maintenance access.
Hospitals and clinics
List the rooms to serve, their operating requirements and where equipment can be accessed for maintenance.
Read the hospital referenceHotels and guest rooms
Plan guest rooms, lobbies and service areas separately. Confirm ceiling clearance and maintenance access in each area.
Explore hospitality applicationsSchools and campuses
Group classrooms, lecture halls and shared spaces by their schedules. Note peak occupancy, ceiling clearance and service access.
View the campus referenceShopping centres and retail stores
Separate public areas, shops and back-of-house spaces in the equipment plan. Confirm opening hours, occupancy and maintenance access.
View the retail referencePlanning a building project?
Share the building use and equipment requirements with our team.