01 / Outdoor source
View source equipment
130 Air-Cooled Module
Begin with the source unit. Confirm the installation and operating requirements before choosing indoor terminals.
Confirm the final equipment combination with the technical team for your operating conditions.
Before matching equipment
Check the source and terminals together
Use your project conditions to frame a matching review with the technical team.
01 / Source
Record outdoor and water-side conditions
Share the design conditions and required heating or cooling duty.
View source unit
02 / Terminals
Review the installation room by room
Compare floor-standing, cassette and concealed formats against available space and access.
Browse fan coil units
03 / Review
Send the known equipment schedule
Bring the source and terminal requirements into one brief so the team can review them together.
Prepare the pairing brief